Interpreting the CMMI (R): A Process Improvement Approach, Second Edition
Level 3
Requirements Development
-
Cost, schedule, and effort expended for rework
-
Defect density of requirements specifications
-
Number of requirements approved for build (versus the total number of requirements)
-
Actual number of requirements documented (versus the total number of estimated requirements)
-
Staff hours (total and by Requirements Development activity)
-
Requirements status (percentage of defined specifications out of the total approved and proposed; number of requirements defined)
-
Estimates of total requirements, total requirements definition effort, requirements analysis effort, and schedule
-
Number and type of requirements changes
Technical Solution
-
Cost, schedule, and effort expended for rework
-
Number of requirements addressed in the product or product-component design
-
Size and complexity of the product, product components , interfaces, and documentation
-
Defect density of technical solutions work products (number of defects per page)
-
Number of requirements by status or type throughout the life of the project (for example, number defined, approved, documented, implemented, tested , and signed-off by phase)
-
Problem reports by severity and length of time they are open
-
Number of requirements changed during implementation and test
-
Effort to analyze proposed changes for each proposed change and cumulative totals
-
Number of changes incorporated into the baseline by category (e.g., interface, security, system configuration, performance, and useability)
-
Size and cost to implement and test incorporated changes, including initial estimate and actual size and cost
-
Estimates and actuals of system size, reuse, effort, and schedule
-
The total estimated and actual staff hours needed to develop the system by job category and activity
-
Estimated dates and actuals for the start and end of each phase of the life cycle
-
Number of diagrams completed versus the estimated total diagrams
-
Number of design modules/units proposed
-
Number of design modules/units delivered
-
Estimates and actuals of total lines of code new, modified, and reused
-
Estimates and actuals of total design and code modules and units
-
Estimates and actuals for total CPU hours used to date
-
The number of units coded and tested versus the number planned
-
Errors by category, phase discovered , phase injected, type, and severity
-
Estimates of total units, total effort, and schedule
-
System tests planned, executed, passed, or failed
-
Test discrepancies reported , resolved, or not resolved
-
Source code growth by percentage of planned versus actual
Product Integration
-
Product-component integration profile (i.e., product-component assemblies planned and performed, and number of exceptions found)
-
Integration evaluation problem report trends (e.g., number written and number closed)
-
Integration evaluation problem report aging (i.e., how long each problem report has been open)
Verification
-
Verification profile (e.g., the number of verifications planned and performed, and the defects found; perhaps categorized by verification method or type)
-
Number of defects detected by defect category
-
Verification problem report trends (e.g., number written and number closed)
-
Verification problem report status (i.e., how long each problem report has been open)
-
Number of peer reviews performed compared to the plan
-
Overall effort expended on peer reviews compared to the plan
-
Number of work products reviewed compared to the plan
Validation
-
Number of validation activities completed (planned versus actual)
-
Validation problem reports trends (e.g., number written and number closed)
-
Validation problem report aging (i.e., how long each problem report has been open)
Organizational Process Focus
-
Number of process improvement proposals submitted, accepted, or implemented
-
CMMI maturity or capability level
-
Work completed, effort and funds expended in the organization's activities for process assessment, development, and improvement compared to the plans for these activities
-
Results of each process assessment, compared to the results and recommendations of previous assessments
Organizational Process Definition
-
Percentage of projects using the process architectures and process elements of the organization's set of standard processes
-
Defect density of each process element of the organization's set of standard processes
-
Number of on-schedule milestones for process development and maintenance
-
Costs for the process definition activities
Organizational Training
-
Number of training courses delivered (e.g., planned versus actual)
-
Post-training evaluation ratings
-
Training program quality surveys
-
Actual attendance at each training course compared to the projected attendance
-
Progress in improving training courses compared to the organization's and projects' training plans
-
Number of training waivers approved over time
Integrated Project Management for IPPD
-
Number of changes to the project's defined process
-
Effort to tailor the organization's set of standard processes
-
Interface coordination issue trends (e.g., number identified and closed)
Risk Management
-
Number of risks identified, managed, tracked, and controlled
-
Risk exposure and changes to the risk exposure for each assessed risk, and as a summary percentage of management reserve
-
Change activity for the risk mitigation plans (e.g., processes, schedules, funding)
-
Number of occurrences of unanticipated risks
-
Risk categorization volatility
-
Estimated versus actual risk mitigation effort
-
Estimated versus actual risk impact
-
The amount of effort and time spent on risk management activities versus the number of actual risks
-
The cost of risk management versus the cost of actual risks
-
For each identified risk, the realized adverse impact compared to the estimated impact
Integrated Teaming
-
Performance according to plans, commitments, and procedures for the integrated team, and deviations from expectations
-
Number of times team objectives were not achieved
-
Actual effort and other resources expended by one group to support another group or groups, and vice versa
-
Actual completion of specific tasks and milestones by one group to support the activities of other groups, and vice versa
Integrated Supplier Management
-
Effort expended to manage the evaluation of sources and selection of suppliers
-
Number of changes to the requirements in the supplier agreement
-
Number of documented commitments between the project and the supplier
-
Interface coordination issue trends (e.g., number identified and number closed)
-
Number of defects detected in supplied products (during integration and after delivery)
Decision Analysis and Resolution
-
Cost-to-benefit ratio of using formal evaluation processes
Organizational Environment for Integration
-
Parameters for key operating characteristics of the work environment