CCIE Routing and Switching Practice Labs

  • Configure ISDN on R3 and R5 using PPP. R3 and R5 should be able to ping each other across the ISDN link.

  • Make sure that only when the ISDN link is up that it will pass routing protocol across the link.

  • The ISDN link should pass routing protocol only when R5-s0/1 and/or R5-fa0/0 and/or R5-fa0/1 is down. Consider that the routing protocol can pass through the ISDN link when topology changes happen.

Категории