13.4 COMPONENT BUILD

Building the components of your measurement program should be mechanistic, Figure 13.9. This does not mean that the build process will not consume significant resources or take a considerable elapsed time to complete: it simply recognizes that most of the work should have been done during the requirements specification and the design stages.

Write procedures and standards - never enough on its own

Prepare training material

Build prototype database

Obtain software packages if necessary

Train Coordinators, i.e. 'build' the staffing infrastructure

Figure 13.9: Component Build

Remember that what you should aim to deliver are complete solutions. That means training, procedures support services, etc. Having these things ready makes the next stage possible.