Software Security: Building Security In
Applying the RMF: KillerAppCo's iWare 1.0 Server
Now that we have a basic understanding of the RMF and its five stages, we can push down a level or two into the details of its application. I use the fictional company KillerAppCo's iWare 1.0 Server product as an example. Don't forget that we're still following the five stages as described earlier. It may be useful to refer back to Figure 2-1 from time to time to track where we are. Although the RMF is a multilevel loop, the remainder of this chapter describes the RMF as a series of stages, tasks, and methods to be performed in succession. The idea is to step through an imaginary example (in this case, KillerAppCo is producing iWare 1.0 Server) and show the kinds of tasks and work products that the RMF suggests. I've already given you a bird's-eye view of the five stages; now it's time to roll up our sleeves and get our hands dirty. In the following treatment, each of the five stages previously introduced follows a process to produce various tables and metrics that build on each other. This example is overly simple. In a normal application of the RMF, it is not unusual for 30 to 50 risks to be identified and tracked. Thus the sizes and makeup of the tables shown in this section would vary. An enhanced version of the RMF has been automated in order to make following the various processes described here more intuitive and less tedious (see the description of the Cigital Workbench near the end of this chapter). Understanding the Business Context
During the first stage of RMF execution, an analyst must extract and describe business goals, priorities, and circumstances in order to understand what kinds of software risks to care about and which business goals are paramount. Gathering the Artifacts
The first step is to obtain documentation about target system resources and artifacts. This is a good time to identify any missing resources necessary for the analysis but not in hand. Typical resources include system architecture (especially with regard to software), accounts, permissions, environments, documents, software artifacts, automated documents, data, and supporting materials. After collecting the artifacts and resources, it is important to validate that they are the correct versions and that the set is complete. Note that an analyst may discover the need to obtain additional system resources and/or to collect additional software artifacts at any point in applying the RMF. Conducting Project Research
An analyst should research the business, program, processes, systems, products, and technologies to the extent dictated by the project's scope. This work should be done independently. In particular, an analyst characterizes the system and may author draft documents and illustrations that summarize the system. One example that almost always comes in handy is a one-page overview of the system's software architecture (see Chapter 5). If a forest-level view is not available, it should be created as early as possible in the RMF process. At this point the analyst should also determine any technical, management, and operational controls that the project currently has in place to detect or prevent software risk. The scope of the RMF project and the size and complexity of the system under review may not allow a uniform approach to analysis across the entire system. To resolve this problem, the analyst should examine the overall system and make an effort to decompose it into a reasonably small set of manageable components. These components comprise the system's software architecture (and should thus be represented in the one-page architectural overview). Each component and the interfaces between them can be analyzed separately by applying a different level of rigor. Depending on function and importance, a subsystem may reside in one component or may be made up of multiple components. The importance of each subsystem is assessed in terms of the identified business goals. All subsystems are subsequently prioritized based on the identified business goals, and a decision is made based on the scope of the RMF project about the depth of the analysis that will be conducted against each subsystem. This approach goes hand-in-hand with the concept of risk management, as the depth of the analysis of any subsystem depends on the importance of the subsystem, and the analyses of different subsystems is likely to shed light on the quality and security of the software system in general. At the end of the research activities, the risk posture of the entire system is examined based on the results obtained for each of the subsystems and their interactions. Knowledge and experience with analysis of similar systems is extremely helpful in this process.[5] During performance of this research, analysts generate research notes and gain a general understanding of the business context, how the target products work, and the role that software plays in the final product. [5] See Chapter 11 for a discussion of the kinds of knowledge useful to software security. Identifying the Business and Technical Risks
The identification of business risks provides a necessary foundation that allows software risk (especially its impact component) to be quantified and described in business terms. Business risk identification helps to define and steer use of particular technical methods for extracting, measuring, and mitigating software risk given various software artifacts. Developing Risk Questionnaires
Preliminary research results should be organized so that an initial set of business risks is identified. At this point, developing a set of risk questions to ask about the project is an important step. These questions should address business risks (e.g., motivation, market, resource, schedule, people, facilities, budget, contracts, program interfaces), project risks (e.g., development process, development system, management methods, work environment), and product risks (e.g., technical defects, design flaws, bugs, issues with languages and platforms). Particular effort should be made to address questions regarding risk indicators, the likelihood that risks may occur, and business impact estimates in case risks materialize. Questions should directly address the project's concerns, how the target technologies work, the fundamental assumptions built into the target, and expected quality and security requirements. After developing a set of risk questionnaires, the analyst must identify the RMF project's key information sources and schedule independent interviews with each of the following types of personnel:
Other technical personnel, such as configuration managers, as well as subject matter experts and end users may also be interviewed. An independent interview approach permits the interviewee to openly disclose and discuss sensitive, critical information without bias or constraints that may be imposed by the presence of others. In most cases, two analystsa facilitator who asks the questions and a recorder who scribes the responsesinterview the principals to ensure efficiency and accuracy. Interviewing the Target Project Team
During an interview, the analyst:
Based on an analysis of the quality of the interview results, and the number and type of new questions that may have resulted from the interview, the analyst may elect to conduct additional research and perform additional risk discovery interviews with newly identified stakeholders to gain a better understanding of the project's software risks and possible solutions. Analyzing the Research and Interview Data
After completing the first set of interviews with the project team, the analyst reviews the interview data to identify, list, and prioritize the business goals and business risks. As an example, Table 2-1 indicates that KillerAppCo's most important business goal, represented by the high (H) ranking, is to release the initial version of their software, iWare Server version 1.0, on January 1, 2008, so that the company can be first-to-market and secure an estimated 25% market share prior to its competitor's entry. KillerAppCo's next most important business goal, ranked as moderate (M), is for the iWare 1.0 Server to meet its Fortune 500 end-user availability requirements: 99.999% uptime, not including normal maintenance and upgrade activities.
Another of KillerAppCo's moderate business goals is for the product to perform all transactions with 100% accuracy, as required by federal financial regulations and standards. Table 2-2 provides very rough guidelines for ranking business goals.
After listing and prioritizing the business goals, the analyst analyzes the data gathered to identify and list the business risks. As indicated in Table 2-3, in our example, the analyst identifies and records four business risks. A similar table should be created as a work product in each application of the RMF.
After fully populating business risk tables with data (the tables shown here present a very small amount of example data), the analyst identifies the risk indicators associated with each identified business risk, as well as the likelihood that each of the identified risks will occur. A risk indictor is a sign that the risk is materializing, an objective, measurable event that can be monitored and measured by the analyst to determine the status of a risk over time. As an example, Table 2-4 identifies the principle risk indicators for the four business risks shown in Table 2-3. For example, one indicator for the risk of failing to meet the acceptance criteria is the number of missed project milestones. Based on experience, professional consultation, and research, the analyst assigns the likelihood that the server will not meet the final acceptance criteria as high (H) (as defined in Table 2-5 on page 56). The analyst also defines indicators for the remaining business risks and assigns the probability of their occurrence as moderate (M). The impact of business risks on business goals should be evaluated. The level of impact and the likelihood of occurrence will allow the analyst to evaluate the impact of a business risk on different business goals.
Table 2-5 shows likelihood values and definitions that analysts can use to determine the likelihood that a risk will occur. After identifying the risk indicators and likelihood probabilities of each business risk, the analyst determines the business impact of each business risk in case the risk materializes. This determination is made by qualitatively describing each risk's impact, including an estimation of the total cost of a materialized risk. For example, in Table 2-6, the analyst specifies that if the iWare 1.0 Server is unable to meet its final acceptance criteria, KillerAppCo will be unable to release the product to the general public on January 1, 2008, and will experience significant business loss due to schedule slippage. The analyst also notes that forecasts currently estimate a product release date of April 1, 2008. Based on initial market analyses, the analyst concludes that the estimated revenue loss due to the protracted schedule is $10 million. Market share loss is also estimated to be 15% and limited brand damage may occur. Given the significance of these drawbacks, a high (H) business impact rating is used (as defined in Table 2-7). The impacts and costs of the remaining three business risks are also defined by the analyst, and the business impact rating for them is determined to be medium (M).
Table 2-7 shows values that can be used to rate the business impact caused by specific business risks. After assessing the business impact of each business risk, the analyst determines each risk's severity, which is a function of the likelihood that the risk will occur (Table 2-5) and the risk's business impact (Table 2-7). In our example, the likelihood that iWare 1.0 Server will be unable to meet its final acceptance criteria is high, and the business impact rating of the risk is also high. By referencing Table 2-8, the analyst deduces that high likelihood and high impact produce a high (H) severity score. The severity scores of the three remaining business risks are determined by the analyst to be medium (M).
After determining the severity score of each business risk, the analyst compiles the full set of business risk data. An example of the resulting table is presented in Table 2-9.
Uncovering Technical Risks
This stage of the RMF also involves discovering and describing technical risks and mapping them to business goals. A technical risk is a situation that runs counter to the planned design or implementation of the system under consideration. Analyzing Software Artifacts
The analyst begins to evaluate software artifacts by performing selected analytical best practices (including the software security touchpoints), some of which require the execution of tools, to help identify technical risks. Table 2-10 presents technical risks resulting from the application of software security touchpoints. In our example, the analyst discovers technical risks that may threaten KillerAppCo's time-to-market, availability, and accuracy business goals. Note that a technical risk may yield multiple business impacts (see TR3 and TR5 in Table 2-10).
Now it's time to determine the indicator(s) associated with each identified technical risk and specify the probability that each risk will materialize. In Table 2-11, the analyst specifies two indicators for the TR4 denial-of-service (DoS) susceptibility risk: a post-deployment increase in unauthorized logins and a post-deployment decrease in mean server availability. Based on independent research, professional experience, and expert collaboration, the analyst also determines the likelihood that the DoS susceptibility risk will occur is high (H). Each remaining technical risk's indicator and likelihood are also defined.
After determining the likelihood that an identified technical risk will occur, the analyst estimates the business impact of each technical risk should it materialize. This link back to business impact is essential. In the example, the analyst documents that poor RNG implementation may lead to system failures, unexplained behavior, and inaccurate transactions (see Table 2-12). Because of this technical vulnerability, unauthorized users can gain access to the system, cause system crashes or unexplained behavior, influence transactions, or create illegitimate transactions. Business impacts are defined by the analyst for each remaining technical risk. If different subsystems are analyzed separately, a cumulative analysis of risks associated with different subsystems is performed. At this time, inter-subsystem risks should also be identified.
Only after the RMF project team is fully satisfied with the initial set of collected business and technical risk data can the analyst proceed to the risk synthesis and prioritization stage. Peer review is an excellent idea. Synthesizing and Ranking the Risks
To better understand and manage risk, analysts establish relationships between the business goals, business risks, and technical risks and subsequently prioritize them in meaningful business terms. The initial objective may be achieved from the bottom up by first determining the technical risks that lead to each business risk(s) and then determining the business risks associated with each business goal. Analysts can also work from the top down, starting with business goals. In either case, to visualize the problem, analysts create the goal-to-risk relationship table, which displays the relationships between:
Note that no attempt is made at this point to set priorities in the goal-to-risk relationship table because this action is performed during the following synthesis activity. As an example, in Table 2-13 the analyst concludes, based on research, professional experience, and expertise, that KillerAppCo's unplanned downtime and system failure business risks directly correspond with the availability goal. The analyst also notes how inadequate fault tolerance testing and DoS susceptibility feed the business risk of unplanned downtime. A similar linkage is created between poor password requirements, inadequate RNG implementation, and limited enforcement of access rules and their collective contribution to the business risk of system failure. Similar relationships are drawn by the analyst for the project's time-to-market and accuracy business goals.
There may be a one-to-many relationship among an identified technical risk and the multiple business risks to which it is related. Note, for example, that the inadequate fault tolerance testing risk (TR3) contributes to both the unplanned downtime and inaccurate operational functions business risks. After developing the goal-to-risk relationship table, the analyst is ready to create a table showing the technical risk severity by business goals. This table depicts how severely an identified technical risk impacts each of the business goals. To determine the severity level, the analyst assesses the likelihood that the technical risk will materialize and builds an estimate of the realized risk's business impacts in terms of each identified business goal. As an example, in Table 2-14 the analyst deduces that inadequate fault tolerance testing (TR1) and DoS susceptibility (TR2) will negatively impact the project's most important business goaltime to marketsince the likelihood of the risks are high and continued acceptance criteria failures (the business risk to which the technical risks are tied) will inevitably prevent the project team from releasing the product on time. No impact (N/A) is discerned between TR1 and TR2 and the other business goals. Note that a single technical risk, such as poor RNG implementation (TR5), may impact multiple business goalsavailability and accuracy. A single technical risk may also impact multiple business goals at different severity levels.
By completing the table linking technical risk severity with business goals, analysts indicate the most severe technical risks that the project should address in order to meet prioritized business goals. In the end, the chart presents the critical risk management information necessary to make informed decisions, such as those involving release management, production, and process improvement. This marriage of business and technical concerns is a central driver to the RMF. These are the sort of data that can be used to answer the all-important "Who cares?" question. Reviewing the Risk Data
Next, the analyst schedules a meeting with the RMF project team to brainstorm about the accumulated risk data. During the brainstorming session, the meeting attendees:
The brainstorming activity typically produces notes as well as updated risk tables. It may also reveal the need for the RMF project team to perform additional analytical activities. Conducting the Business and Technical Peer Review
After completing all research, risk identification, and synthesis activities, the analyst creates an interim report or presentation summarizing the risk findings and outlines a preliminary risk mitigation strategy. The completed summary is submitted to the RMF project team for business and technical peer review. Note that peer review can sometimes be a time-consuming process; make sure that time is allocated both for necessary peer reviews and for the incorporation of feedback. Defining the Risk Mitigation Strategy
During this stage, the analyst builds and finalizes a risk mitigation strategy. An outline of this strategy will have been created during the risk synthesis activity. To develop a coherent strategy, the RMF project team meets to brainstorm on possible risk mitigation methods, their effectiveness, and control over the project's software-induced business risks. Results of this work are reported in a comprehensive risk analysis report document. Brainstorming on Risk Mitigation
During the risk mitigation brainstorming session, the RMF project team should answer the question, "How can the software risks that have been identified be managed?" Using this question as a guidepost, the RMF project team members list potential mitigation methods on a whiteboard. Next, they associate the proposed methods with identified technical risks. The group then estimates the effectiveness of the proposed mitigation methods and the level of rigor at which each method must be performed. The resulting approach is a technical strategy motivated by business concerns. Methods must make sense economically, and in the best of all cases they will have a clear ROI that can be demonstrated. All costs of mitigation must be weighed against each method's predicted effectiveness and compared against potential downside costs (in case a risk materializes). The RMF project team should ensure that the proposed mitigation methods cover as many of the risks as possible. Those methods that provide large risk coverage at low cost are more valuable. The team also assesses the impact of legislation, regulation, and organizational policy on the ability to perform specific mitigation methods, as well as the impact of method implementation on operations. After strategizing activities are complete, the team creates a mapping between specific methods and the mitigation of identified business risks. The mapping is given a level of confidence (high, medium, or low). The fully populated table of recommended risk mitigation methods presents the information needed to help make risk mitigation decisions crucial to the success of the business. Using these data, stakeholders can clearly think through costs, benefits, and return for various technical activities. This table provides the basis for a description of the risk mitigation strategy. As an example, in Table 2-15 the analyst highly recommends that the project impose additional QA activities in early SDLC phases to improve the company's chances of meeting its number one business goaltimely release of the product to the market. Although the coverage of this mitigation method is limited to only two of the four business risks, it is estimated that the practice of the method will result in the highest possible ROI in terms of (1) avoided loss of revenue and market share and (2) bypassed brand and reputation damage (see Table 2-9). Specific QA mitigation activities may include having developers use best-of-breed QA tools for early lifecycle unit testing and evaluating requirements during QA test-planning activities. Table 2-15. KillerAppCo's Recommended Risk Mitigation Methods
Authoring the Risk Analysis Report
After completing the table of recommended risk mitigation methods, the analyst authors a risk analysis report.[6] Much of the RMF project's analytical plan content and summary risk data can be used to build the final document. The report contains the following information in this order: [6] This is not meant to imply that looping through the RMF process is complete. In this case, I am sticking with my "serial order" presentation for reasons of clarity. Also, a report is oriented toward consulting, but you get the idea.
By addressing the preceding information, the risk analysis report:
Producing Final Deliverables
After completing the draft risk analysis report, the analyst presents the document to the RMF project team for peer review and subsequent editing. The analyst then uses the document as the basis for creating a draft risk mitigation project plan. The interim risk analysis report is also used to develop a risk analysis presentation to be delivered by the team. The presentation should contain a cost-based summary of the critical content included in the risk analysis report and focus on post-risk mitigation ROI. The analyst should incorporate feedback resulting from the risk analysis presentation into the final draft of the risk analysis report as well as the accompanying project plan. Carrying Out Fixes and Validating
This stage involves execution of the risk mitigation strategy. Each strategic approach to risk mitigation will differ according to what sorts of risks were identified, what the business context is, and what methods were chosen to manage risk. Progress at this stage should be measured against the risk mitigation strategy. Good metrics include but are not limited to progress against risks, open risks remaining, and any artifact quality metrics previously identified. This stage involves application of those validation techniques identified earlier in order to give some confidence that risks have been properly mitigated through artifact improvement. In many respects, the validation plan is a test plan for risk mitigation assurance. Each project will have a unique validation plan that directly depends on the risks identified and the methods chosen to address them. Testing can be used to demonstrate and measure the effectiveness of various software assurance activities. The central concern at this stage is to validate that the artifacts and processes no longer carry unacceptable risks. This stage should define and leave in place a repeatable, measurable, verifiable validation process that the project can run from time to time to continually verify artifact quality. |