CISSP For Dummies
1. | The longest period of time that a business can survive without a critical function is called
| |
2. | Which of the following is NOT a natural disaster?
| |
3. | The impact of a disaster on business operations is contained in
| |
4. | The decision whether to purchase an emergency generator is based upon
| |
5. | The purpose of a UPS is
| |
6. | The Business Impact Assessment
| |
7. | To maximize the safety of backup media, it should be stored
| |
8. | An alternate information processing facility with all systems, patches, and data mirrored from live production systems is known as a
| |
9. | The greatest advantage of a cold site is
| |
10. | The most extensive test for a Disaster Recovery Plan
| |
Answers
1. | D. Maximum tolerable downtime.This is the term that describes the maximum period of time that a business function can suspend operations and the company can still survive. Review “Defining the Business Impact Assessment.” |
2. | B. Stock market crash. A stock market crash is a man-made (nonnatural) disaster. Review “Defining Disastrous Events.” |
3. | B. Business Impact Assessment.The BIA describes the impact that a disaster will have on business operations. Review “Defining the Business Impact Assessment.” |
4. | C. The duration of a typical outage.The average and worst-case duration of electrical power outages help to determine whether an emergency generator should be purchased. Review “BCP Recovery Plan Development.” |
5. | A. To provide instantaneous power cutover when utility power fails. A UPS provides continuous electric power to all equipment connected to it. Review “BCP Recovery Plan Development.” |
6. | B. Describes the impact of a disaster on business operations. A Business Impact Assessment (BIA) contains quantitative and qualitative estimates of the impact of a disaster. Review “Defining the Business Impact Assessment.” |
7. | A. At a specialized off-site media storage facility. Such a specialized facility is designed to withstand most disastrous events. Review “BCP Recovery Plan Development.” |
8. | B. Hot site. Although a hot site is the most expensive to build and maintain, it provides the greatest possible performance. Review “BCP Recovery Plan Development.” |
9. | C. Its low cost. Cold sites are inexpensive but are also the slowest to set up and get running. Review “BCP Recovery Plan Development.” |
10. | D. Is known as an interruption test. The interruption test performs an actual failover of applications to the servers. Review “Testing the Disaster Recovery Plan.” |