Enterprise Data Center Design and Methodology

 
[SYMBOL] [A] [B] [C] [D] [E] [F] [G] [H] [I] [L] [M] [N] [P] [R] [S] [T] [U] [V] [W]

cable trays  

       network:routing cables  

cabling

       bundling   2nd  

       Category 5  

       correct lengths  

       from PDUs[cabling

               PDUs]  

       home runs   2nd  

       in plenum[cabling

               plenum]  

       labeling   2nd  

       multi-mode fibre  

       network

               PODs to devices  

        plenum-rated  

       routing   2nd  

       testing   2nd  

       tracing  

       verification  

cabling: color coding

       color coding:cables  

cabling:routing

       wiring:routing  

capacities  

       floor load  

       introduction to  

       load specifications

               weight:raised floor specifications  

       planning  

card readers

       security:card readers

               physical access:card readers  

Category 5,

       cabling:Category 5   [See cabling]

cipher locks

       security:cipher locks

               physical access:cipher locks  

circuit breakers  

       in PDUs[circuit breakers

               PDUs]  

cleaning  

co-location  

code

       and law[code

               law]  

       and quagmires[code

               quagmires]   2nd  

       building   2nd  

       earthquake hazards and  

       fire  

       mechanical support system and  

       Power Distribution Units (PDUs)  

       ramps, lifts and  

       SRG and  

       types  

       wireways and  

code:and engineers[code: engineers ]

       engineers:and code[engineers:code]  

code:toxic hazard

       building code,   [See code]

Command Center  

       and contaminants [Command Center

               contaminants]  

       public relations  

       reasons for  

condensers

       HVAC:condensers  

connectivity

       administrative network  

       local availability  

       network:connectivity  

       requirements  

connectors

       dongle  

       fibre  

       RJ-45  

construction

       in online data center[construction

               online]  

       isolating activity  

       materials  

contaminants

       agglomeration of  

       air dams  

       and human movement[contaminants

               human]  

       and short circuits[contaminants

               short]  

       and thermal failures[contaminants

               thermal]  

       avoiding   2nd  

       cleanings   2nd  

       effects of   2nd  

       electrostatic problems  

       exposure points  

       filtration  

       gaseous   2nd  

       in subfloor void[contaminants

               subfloor]  

       particulate   2nd  

       staging area  

       trash  

       types and sources   2nd  

contaminants:in subfloor void[contaminants:subfloor]

       plenums:contaminants in  

contractors,

       engineers:electrical   [See engineers]

Cooling Short Cycle air flow patterns  

cooling,

       HVAC:See also air flow[HVAC:aaa]   [See HVAC]

corrosion  

criteria

       essential  

       secondary  

criteria, data center   2nd  

criteria:construction

       construction:criteria   2nd  

cross-patch ports

       connectivity:cross-patch ports  

 

Категории