Enterprise Data Center Design and Methodology

 
[SYMBOL] [A] [B] [C] [D] [E] [F] [G] [H] [I] [L] [M] [N] [P] [R] [S] [T] [U] [V] [W]

pallet jacks  

Particulate Matter and Junk on the Floor  

patch panels  

       density  

patch panels:testing

       verification:of cables and ports[verification:cables]  

PDF format  

philosophy

       design:philosophy  

       flexibility  

       modularity  

        sanity  

       scalability  

       simplicity  

physical capacity  

physical space requirements  

plenums

       in ceiling[plenums

               ceiling]   2nd   3rd  

Point Of Distribution (POD)  

       network:cabling:PODs

               connectivity:PODs  

       verification  

power  

       amount needed  

       analyses  

       breakers

               sharing  

               upgrading  

       cables to racks  

       conditioning  

       degrading influences  

       distribution system

               installation  

               placement  

               requirements  

       electromagnetic interference  

       emergency disconnect  

       for HVAC  

        harmonic content  

       input quality  

       L6-30R outlets   2nd   3rd  

       lightning problems  

       local availability  

       outlets  

        overcurrent protection  

       panels  

       PDUs  

       redundancy   2nd  

       single- and three-phase wiring  

       testing  

       voltage spikes  

Power Distribution Units (PDUs)  

       meeting code  

power:backup generators

       power:generators

               generators,   [See power, generators]

power:cabling, breakers to outlets

       cabling:in plenum[cabling:plenum]  

power:distribution system:design

       design:power distribution system  

power:failure rate

       power:   [See also bonding and grounding [power:aaa]]

power:generators:redundancy

       redundancy:power generators  

power:Hubble connectors

       connectors:Hubble  

power:noise control

       grounding:noise control  

power:requirements

       electrical:   [See also power[electrical:aaa]]

project

       scope  

       viability  

Proper Aisle Space and Non-Continuous Rows  

 

Категории