Enterprise Data Center Design and Methodology

 
[SYMBOL] [A] [B] [C] [D] [E] [F] [G] [H] [I] [L] [M] [N] [P] [R] [S] [T] [U] [V] [W]

safety

       air quality  

       at loading dock[safety

               loading]  

       fire extinguishers  

safety:personnel

       safety:   [See also emergency and hazard [safety:aaa]]

security

       access:to data center[access:data center]  

       Command Center  

       equipment:security  

       fire prevention  

       logical access

               logical access;access:logical security  

       minimizing traffic  

       motion detectors  

       physical access

               physical access;access:physical security;physical access:restrictions  

       remote access  

       remote management  

       traps  

       using Command Center[security

               Command Center]  

       vandalism  

       video cameras   2nd  

        windows and doors  

security:Command Center

       Command Center

               security  

security:network

       network:security  

security:video cameras

       physical access:video cameras

               cameras,   [See security, video cameras;video cameras, See security, video cameras]

seismic activity,   [See hazards, earthquakes]

seismic bracing

       raised floors:seismic bracing  

shipping and receiving

       accessibility  

       protection from elements  

       site:shipping and receiving  

Signal Reference Grid (SRG)

       power:SRG  

       recommended practices   2nd  

Simple Network Monitoring Protocol (SNMP)   2nd  

site  

       and networking[site

               networking]  

       data center area criteria  

       expansion  

       geographic criteria  

       geographic location   2nd  

       loading dock  

        retrofitting  

       selection   2nd  

       structural layout   2nd  

       structural limitations  

site:hazards

       location,   [See site]

site:raised floors

       raised floors:viability of  

software

       Aperture   2nd  

       AutoCAD   2nd   3rd  

       Flovent   2nd   3rd  

       Verification Test Suites (VTS)  

Southern Building Code Congress International, Inc. (SBCCI)  

spaghetti

       avoiding   2nd   3rd  

Spaghetti on the floor  

staging area

       site:staging area  

        videotaping in  

storage

       documenting process  

       in staging area[storage

               staging]  

       outsourcing  

       sheds  

       site:storage  

Storage Area Network (SAN)  

storage: contaminants

       contaminants:and stored items[contaminants:stored]  

straight jackets

       avoiding them  

sub-switches  

       connectivity:sub-switches  

       preconfiguring  

subfloor

       breaches   2nd   3rd   4th   5th  

       integrity  

       sealants and hardeners  

       sharing  

subfloor:

       plenums   [See also plenums[subfloor:aaa]]

Suggested front-to-front hardware configuration (top view)  

Sun Management Center (SunMC)  

support grid

       raised floors:support grid  

support systems   2nd  

surge suppression  

surveillance systems,   [See video cameras]

system

       availability   2nd  

       redundancies  

system:monitoring

       system:status  

 

Категории