Enterprise Data Center Design and Methodology

   

There are times when too many compromises must be made to make the data center project viable . It might be something obvious (you can't get enough power from the local power company or there are frequent flooding problems), or it might be a number of small factors that, when looked at collectively, show that the project is a bad risk. Consider the following possible constraints on the project:

  • Inadequate budget

  • Retrofit problems such as grounding , cable routing, inadequate floor to ceiling height, no way to set up seismic restraints, etc.

  • Better business decision to use co-location or ISP, if only temporarily

  • Inadequate pool of qualified employees

  • Overly expensive location

  • Inadequate district or too remote

  • Inadequate or inappropriate space

  • Inadequate power. Can't connect to separate parts of the grid for redundancy

  • Inadequate cooling capacity

  • Inadequate ISP service

  • Local building codes, insurance, or fire regulations are too restrictive

  • Too many weather or seismic problems

  • High history of fires

Most of these problems have to do with the inadequacies of the location. For more information, see Chapter 5, "Site Selection."

   