Six Sigma Fundamentals: A Complete Introduction to the System, Methods, and Tools

Environmental Management Systems (ISO 14001)

ISO 14001 specifies the requirements of the environmental management system (EMS). EMS, like six sigma and PSM, needs to have senior management commitment and to be structured and integrated within the management system to be effective. The requirements are applicable to all kinds of organizations, be it a manufacturing industry or a service industry. The EMS model consist of five categories:

Project team. The first step in implementing ISO 14001 together with six sigma is to establish a project team. The project team, which can be named the EMS-six sigma implementation committee or steering committee, steers the sequence of adopting both ISO 14001 and six sigma. An employee from the environmental department is the best choice to lead this process. This employee should be trained to a level of master black belt (MBB) in the six sigma methodology. Another two employees should be assigned to the committee, one from the engineering division and one from the budget department.

Environmental policy. Environmental policy has an important role in the implementation of ISO 14001. The definition of the policy shall ensure the following:

Planning. The organization is required to establish and to maintain a procedure to identify activities that have environmental aspects. These aspects are to be considered in defining environmental objectives. The framework of these objectives should be sensitive to changes in legislation, and to perform activities to meet the requirement derived from legislation changes. Objectives and targets are expected to be defined in the planning stage and to be documented. The establishment of a program to achieve the objective and its targets is part of the planning stage and it should include the following:

In this category, the process is studied in order to determine the changes that will lead to the improvements.

Structure and responsibilities. Definition of roles, responsibilities, and authorities are among the first steps in the implementing of ISO 14001. A representative from top management shall be assigned to that mission, irrespective of his other responsibilities. The steering committee analyzes the framework and obtains the requirements for sources allocation. (If the implementation of ISO 14001 is in order to became certified, a registrar firm should be contacted for the registration.)

Training, awareness and competence. All employees whose work will significantly impact the environment must be appropriately trained. The steering committee prepares a training program for the employees that will address the awareness of the following:

Communication. The steering committee shall establish a procedure for internal communication between the different levels of functions, and for receiving, documenting and responding to external interested parties.

EMS documentation and document control

A documentation of the interaction among the core elements of an EMS is required. Establishing a document control procedure ensures that:

Operational control. Activities that are associated with significant impact on the environments have to be redesigned to ensure the following conditions:

Emergency preparedness. Scenarios of accident and emergency situations should be treated in the following sequence:

Checking and corrective actions

Monitoring and measurement. Monitoring and measuring activities that have significant impact on the environment are key elements in maintaining environmental policy. Documented procedures for measurements and monitoring are required by the ISO. The information revealed from this monitoring and measuring shall be recorded in order to track conformance performance. Monitoring equipment should be calibrated and a record of this process should be retained.

Corrective and preventive actions. The international standard (ISO14000) requires the establishment of procedures that define the responsibility and authority of handling, investigating and taking corrective actions to mitigate and prevent nonconformance.

EMS audit. The purpose of auditing is to verify the process conforms to the planning, and proper implementing of EMS. The results of the auditing process should be presented to the management.

Management review. Management review is required to verify EMS's continual improvement, adequacy and effectiveness, and to address changes in policy needed to maintain continual improvement.

Environmental performance evaluation (ISO 14031)

ISO 14031, environmental performance evaluation (EPE), identifies the key elements of evaluation for any organization that does not have EMS. Typical items are:

ECIs reflect the environmental condition and help in understanding the potential impact that the organization's activities have on the environment.

The information generated by an EPE can assist in the following:

EPE process model. EPE is an internal process that uses indicators for the evaluation of the organizational environmental performance. EPE methodology consists of four stages that follow the plan-do-check-act (PDCA) model where:

EPE is a very strong measurement tool that can lead to the successful implementation of ISO 14001 and can be a tool to be used by the six sigma methodology.

Comment

The six sigma methodology is inherent in OSHA PSM elements, although the measurement of the bottom line performance on the sigma metric scale is missing. Identifying the PSM sigma metric is not a simple task, but it is applicable. It is possible to measure the sigma metric of subsequences in the PSM with different parameters. Then, the subsequence can be improved to a six sigma level separately, and by that it will contribute to the improvement of the main program.

The six sigma methodology is applicable to environmental management systems. The EMS leads to a state of continual improvement and has the basic features that are essential to any system that is applicable to the implementation of a quality management system. A model of the combined six sigma-EMS system should consist of the different stages of both standards. Table 8.2 is a summary of the combined stages with recommendations to the ownerships of each stage.

Table 8.2: A summary of the six sigma and EMS stages

Stage

Requirements

Ownership

Environmental policy

Management commitment to EMS and six sigma

Champion

Definition of framework

Steering team

Communicating the policy with the employees, with third parties and with the local community.

Marketing

Document environmental policy.

Archive

Planning

Identify activities with environmental aspects.

EH&S [*]

Perform process mapping

MBB

Define customer research procedure

Marketing

Study customer needs

Marketing

Derive CTQs

BB

Calculate customer satisfaction limits

BB

Calculate the desired average and standard deviation.

BB

Define objectives and targets

Steering team

Establish program to achieve objectives and program

EH&S

Set time-frame

Steering team

Define allocation of resources

MBB

Build teams

MBB

Define training program

EH&S

Train teams in six sigma aspects

Consulting firm

Determine criteria

EH&S

Define and select indicators to EPE

Consulting firm

Implementation and operation

Define structure and responsibilities

Steering team

Allocate resources

Champion

Implement training program

EH&S

EMS measurements

Collect data

Operations

Analyze data

EH&S

Assess information

EH&S

Report to top management

EH&S

Perform current sigma metric calculation

MBB

Perform six sigma data analyzing

MBB

Perform root cause analyses

MBB

Define opportunities to improvements

Engineering

Perform documentation

Archive

Improve

Generate solutions

Engineering

Select solution

EH&S

Design

EH&S

Verify by experiments and pilots (if needed)

Engineering

Implement improvement

Operations

Perform documentation

Archive

Emergency preparedness

Perform drills of emergency response

EH&S

Evaluate effectiveness

EH&S

Improve program

EH&S

Report

EH&S

Perform documentation

Archive

Review

Review

Steering team

Evaluate if policy needs changes

EH&S

Redefine environmental policy

Champion

Checking and Corrective actions

Perform measurements and monitoring

Operation

Recalculate sigma metrics

BB

Present results on control charts

MBB

Report

MBB

Perform improve sequence

Perform standardization

EH&S

Audit

Multiple

Perform documentation

Archive

MBB—Master black belt

BB—black belt

[*]EH&S—Environmental, Health and Safety

Категории