Six Sigma and Beyond: Design for Six Sigma, Volume VI

Regardless of the type, all FMEAs should be conducted as early as possible. FMEA studies can be carried out at any stage during the development of a product or process. However, the ideal time to start the FMEA is:

Note  

Once the FMEA is initiated, it becomes a living document, is updated as necessary, and is never really complete.

Therefore:

Категории