HP ProLiant Servers AIS: Official Study Guide and Desk Reference

 < Day Day Up >   

[SYMBOL] [A] [B] [C] [D] [E] [F] [G] [H] [I] [J] [K] [L] [M] [N] [O] [P] [Q] [R] [S] [T] [U] [V] [W] [Z]

cables

     SCSI bus transactions 2nd 3rd 4th

     Serial SCSI 2nd

cabling

     Fibre Channel 2nd

         attenuation 2nd

         macro bending 2nd

         micro bending

         multimode fibre 2nd 3rd 4th 5th 6th

         safety requirements 2nd

         single-mode optic fibre 2nd

     HP rack management 2nd

cach

     hit

cache 2nd 3rd 4th

    improving performance

         architecture 2nd 3rd 4th

         bus masters 2nd

         direct mapped 2nd 3rd

         fully associated 2nd

         multiprocessor operation 2nd

         set-associative 2nd

         single-processor operation 2nd

         write to cache 2nd 3rd

     levels and placement 2nd

     lines 2nd

    read/write

         Array controller 2nd

         ratio 2nd

     tag RAM 2nd

cache-coherent Non-Uniform Memory Access

     (cc-NUMA)

capacity

     customer considerations

capacity expansion

     Array controllers 2nd 3rd

CAS

     (column address strobe)

CAS latency

cc-NUMA

     (cache-coherent Non-Uniform Memory Access)

chips

     memory

chipsets 2nd 3rd 4th

     bus mastering 2nd

     crossbar switch 2nd

     dual independent bus architecture 2nd

     F8 2nd

         advantages 2nd

         architecture 2nd 3rd

     HPSA (Highly Parallel System Architecture) 2nd

     MIOC architecture 2nd

     original server architecture 2nd

     parallel I/O buses 2nd

     ProFusion chipset 2nd

chunks 2nd

circuit boards

     system board 2nd

classification

     Proliant servers 2nd 3rd

cloc

     ticks

clocks 2nd

     cycles

     processor synchronization

column address strobe

     (CAS)

Compaq Support Paqs

competencies

     AIS (Accredited Integration Specialist) 2nd

         administrative and operation task performance

         deployable solution planning and design

         fundamental server technology explanation and recognition 2nd

         HP management and serviceability tools

         industry-standard systems marketplace and competitive positioning

         server and storage troubleshooting

         solution performance tuning and optimization

         system installation, configuration, setup, and upgrade 2nd

components

     customer considerations

    hardware

         server installation 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th 28th 29th 30th 31st 32nd 33rd 34th 35th 36th 37th 38th 39th 40th 41st 42nd 43rd 44th 45th 46th 47th 48th 49th 50th 51st 52nd 53rd 54th 55th 56th

     processor 2nd 3rd 4th

    server installation

         support packs 2nd

configuration

     ACU (Array Configuration Utility)

    server setup flow

         boot options 2nd

         defaults 2nd

         dynamic setup support

         ROM functionaltiy 2nd

         system maintenance menu 2nd

     system startup 2nd

configurations

     ORCA (Option ROM Configuration for Arrays)

connectors

     SCSI bus transactions 2nd

         terminator power 2nd

     USB (Universal Serial Bus) 2nd 3rd

     Wide-Ultra2 SCSI-3 2nd

console switches

     HP rack 2nd 3rd 4th

         IP 2nd 3rd

         legacy server 2nd

control buses

control signals

     buses 2nd

control units 2nd

controller multiplexing

controllers

     memory

copper fiber

     Fibre Channel 2nd

         attenuation 2nd

         macro bending 2nd

         micro bending

         multimode fibre 2nd 3rd 4th 5th 6th

         safety requirements 2nd

         single-mode optic fibre 2nd

copy backups

cpqacuexe command

CPQONLIN.NLM utility

CRC (cyclic redundancy check)

CRC (Cyclical Redundancy Check)

     Wide-Ultra2 SCSI-3

critical applications

     availability 2nd

crossbar switches 2nd

CSP

Custom Builder configuration tool

     HP Enterprise Configurator utility 2nd 3rd 4th

         functions 2nd

customer profiles

     server design

customers

     budget determination 2nd 3rd

         Gartner IT HealthCheck TCO

         Microsoft Rapid Economic Justification (REJ) framework

    evaluation

         Adaptive Enterprise 2nd

         HP alliances and programs 2nd

         online tools 2nd 3rd

         Services Network

         support options 2nd

     needs analysis 2nd

     scope of work 2nd

     server placement decision 2nd

     site survey 2nd

         server selection data application 2nd

cycles

     bus performance 2nd

cyclic redundancy check (CRC)

Cyclical Redundancy Check (CRC)

     Wide-Ultra2 SCSI-3

 < Day Day Up >   

Категории