HP ProLiant Servers AIS: Official Study Guide and Desk Reference

 < Day Day Up >   

[SYMBOL] [A] [B] [C] [D] [E] [F] [G] [H] [I] [J] [K] [L] [M] [N] [O] [P] [Q] [R] [S] [T] [U] [V] [W] [Z]

tab 68-pin tab storage

    SCSI hard drives

         standards summary

tag RAM

     cache 2nd

tagged command queuing

     (TCQ)

     drive array

tagged command queuing (TCQ) 2nd 3rd

tapes

     backup rotation scheme 2nd

         full backup 2nd

         grandfather-father-son (GFS) 2nd 3rd

         partial backups 2nd

tCAC

TCP (Transmission Control Protocol)

TCQ

     (tagged command queuing)

     drive array

TCQ (tagged command queuing) 2nd 3rd

technologies

     Array controllers 2nd

         accelerator 2nd

         automatic data recovery 2nd

         capacity expansion 2nd 3rd

         data protection 2nd 3rd

         disk striping 2nd

         drive failure protection technology 2nd

         DSR (Dynamic Sector Repair) 2nd

         hot-plug drive support 2nd 3rd

         logical drive expansion 2nd

         online spare drives 2nd 3rd

         online stripe-size migration

         performance tuning

         RAID-level migration 2nd

         stripe size optimization 2nd 3rd

     drive array 2nd

         features 2nd 3rd

         logical drives 2nd 3rd

         number or drives 2nd

templates

     EPIC (Explicitly Parallel Instruction Computing)

terminal window mode

terminator power

     SCSI bus connectors 2nd

Test Computer

     Server Diagnostics 2nd

TFT (thin film transistor)

     HP racks

thermal plan

     customer considerations

thermal power components

thin film transistor (TFT)

     HP racks

third-party drives

     SCSI implementation

third-party integration

     customer consideration

threads

     scheduling 2nd

tightly coupled architectures

     multiprocessor server

timing

     PCI bus versus PCI-X bus

topologies

     Fibre Channel 2nd

         arbitrated 2nd

         switched fabric 2nd 3rd 4th 5th 6th

topology

     Fibre Channel

tRAC

transactions

     SCSI bus

         cables 2nd 3rd 4th

         connectors 2nd 3rd 4th

         disconnect and reconnect 2nd

         electrical signaling systems 2nd 3rd 4th 5th 6th 7th 8th 9th 10th

         negotiation 2nd 3rd

         tagged command queuing (TCQ) 2nd 3rd

transfer cycles

     data

Transmission Control Protocol (TCP)

triple-peer I/O buses

troubleshooting

     Enhanced Integrated Management Display Service

     Integrated Management Display (IMD) 2nd

     Integrated Management Display Utility 2nd

     Integrated Management Log (IML) 2nd

     Integrated Management Log Viewer 2nd

     Maintenance and Service Guides (MSGs)

     memory 2nd 3rd

     methodology 2nd

         data collection 2nd 3rd 4th

         develop action plan 2nd

         evaluate results

         evaluating data

         execute action plan

         preventive measures implementation 2nd

     networks 2nd

         Gigabit Ethernet 2nd 3rd 4th

         Network Configuration Utility 7 2nd

         Network Interface Performance object

         Network Monitor agent 2nd

         subsystem tuning 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st

     normal operation assessment 2nd

     PartSurfer Service Parts Information tool 2nd

     processors 2nd 3rd 4th

     resolving software issues 2nd

         creating software repository 2nd 3rd 4th

         deployment options 2nd

         maintenance architecture 2nd 3rd 4th 5th 6th 7th 8th 9th

         maintenance strategies 2nd

         management considerations 2nd

         operating system requirements

         PCN (product change notification) 2nd

         Softpacks 2nd

     SCSI hard drives 2nd

     Server Diagnostics

         diagnostic tests 2nd 3rd

         Test Computer 2nd

     server installation 2nd 3rd

         failed SmartStart installation 2nd

     storage 2nd 3rd

     subsystems 2nd

     upgrades 2nd

tunneling

     Fibre Channel 2nd

 < Day Day Up >   

Категории