Windows Server 2003 on Proliants. Deployment Techniques and Management Tools for System Administrators

 <  Day Day Up  >    

[SYMBOL] [A] [B] [C] [D] [E] [F] [G] [H] [I] [J] [K] [L] [M] [N] [O] [P] [Q] [R] [S] [T] [U] [V] [W] [X] [Z]

mail and messaging administrators

        assessment team members

mail connectivity

        multi-forest deployment of Exchange design

Mail Migration Wizard 2nd

        Clone Mode

mail-enabled applications

       technical assessment

                migration to Exchange 2003 2nd

maintenance

        software 2nd 3rd 4th

                acquisition 2nd 3rd 4th

                best practices 2nd 3rd 4th 5th

                installation 2nd 3rd

                maintenance cycle

                notification 2nd 3rd

                SmartStart for Servers

                tools 2nd

                version control 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th

Majority Node Set (MSCS) quorum scheme 2nd

managed systems

        HP SIM architecture 2nd

        setup 2nd

        system requirements for HP SIM installation 2nd

managedBy object

Management Agents 2nd 3rd 4th 5th 6th 7th 8th 9th

        components 2nd 3rd 4th

        installation 2nd

                requirements 2nd

                SmartStart CD 2nd 3rd 4th 5th 6th

                SNMP 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd

                TCP 2nd 3rd

                TCP/IP 2nd 3rd

        System Management home page 2nd 3rd

        Web-enabled 2nd

        Windows 2000 architecture 2nd 3rd 4th 5th 6th

management and administration structure section (assessment data template) 2nd

Management CD

Management Information Base (MIB)

management processors

        ProLiant servers 2nd 3rd 4th

management sponsors

        assessment team members

management structure

        Exchange 2003 design 2nd

management tools

        Terminal Server Licensing 2nd

management utilities [See systems management utilities]

Managing Multiple Remote Access Servers dialog box

manual installation

        Windows Server 2003 2nd

                from Windows 2000 2nd

                from Windows NT 4.0 2nd

manual server installation (SmartStart) 2nd

MAPI

        (messaging application programming interface)

memory

        ProLiant servers 2nd 3rd

        sizing Exchange 2003 servers

Memory tab (Resource Partition Overview dialog box) 2nd 3rd

Memory tab (System Overview dialog box) 2nd 3rd

menu bar (RDU)

Message Queue Triggers

        clustering 2nd

messaging application programming interface [See MAPI]

messaging infrastructure

       technical assessment

                migration to Exchange 2003 2nd 3rd 4th

messaging services

        Dial Tone

methods

        WMI 2nd

MIB (Management Information Base)

Microsoft

        calculating ROI 2nd 3rd

Microsoft Cluster Server [See MSCS]

Microsoft Database Engine [See MSDE]

Microsoft Exchange 2000 Infrastructure Design

Microsoft Exchange 2003 2nd

       deployment

                antiSPAM requirements 2nd 3rd 4th 5th 6th 7th

                security 2nd

        DSAccess 2nd

        migration to 2nd

                Exchange design 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th 28th 29th 30th 31st 32nd 33rd 34th 35th

                planning 2nd 3rd 4th 5th 6th

                technical assessment of environments 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th

        ProLiant servers

                GC servers 2nd

        server sizing and placement 2nd 3rd

                centralized placement 2nd

                circular logging 2nd

                clustering 2nd

                databases 2nd 3rd

                distributed placement 2nd

                server categories 2nd 3rd

                storage groups 2nd

                transaction logs 2nd

        versions

Microsoft Exchange 2003 2003

Microsoft Management Console 2nd [See MMC]

Microsoft Operations Framework [See MOF]

Microsoft Operations Manager [See MOM]

Microsoft Systems Architecture Internet Data Center [See IDC architecture]

Microsoft Windows [See Windows]

migration [See deployment, upgrade paths]

migration planning 2nd 3rd

        Active Directory (AD) logical design 2nd 3rd 4th

                design team members 2nd

                domain structure 2nd 3rd 4th 5th 6th 7th 8th 9th 10th

                File Replication Service (FRS) 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th

                forest structure 2nd 3rd

                Group Policy 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th

                naming standards 2nd 3rd 4th 5th 6th

                OU structure 2nd 3rd 4th 5th

                replication topology 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th 28th 29th 30th 31st 32nd 33rd 34th 35th 36th

                security planning and design 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd

                trust definitions 2nd 3rd 4th 5th

        application assessment 2nd

        assessment phase 2nd 3rd

                benefits analysis and recommendations 2nd

                best practices 2nd

                data gathering 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th 28th 29th 30th 31st

                infrastructure impact 2nd

                team members 2nd 3rd

                training requirements

       business plans

                calculating ROI 2nd 3rd 4th 5th 6th

                hard cost savings 2nd 3rd 4th

                incidental cost savings 2nd

                postponing migration 2nd

                presenting to management 2nd 3rd

                ProLiant cost savings 2nd

                ROI (Return on Investment) 2nd

                TCO (Total Cost of Ownership) 2nd

                technical justification 2nd

       case studies

                county government office 2nd 3rd

                Eastman Chemical Company 2nd 3rd 4th 5th 6th 7th

                Hewlett-Packard (HP) and Compaq merger 2nd 3rd 4th 5th

        functional levels 2nd

                domain functional level 2nd 3rd 4th

                features available 2nd 3rd 4th

                forest functional level 2nd 3rd

                interim mode

                interoperability 2nd 3rd 4th 5th

        methodologies 2nd 3rd

                in-place upgrade 2nd 3rd 4th 5th 6th 7th 8th 9th

                intra- and inter-forest migrations 2nd

                ProLiant post-upgrade tasks 2nd

                ProLiant system requirements 2nd 3rd

                restructure method 2nd 3rd

        network assessment 2nd

        phases of migration 2nd 3rd 4th

        physical design

                Build Guides 2nd

                documentation 2nd

                documentation of existing network 2nd

                file and print services 2nd

                network services 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th

                ProLiant servers 2nd 3rd 4th

                server placement 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th

                time synchronization 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th

        pilot 2nd 3rd

                application test plan 2nd

                communications plan 2nd

                contingency plan 2nd

                documentation and tools

                evaluation 2nd

                requirements and goals 2nd

                schedule 2nd

                support plan 2nd

                user selection 2nd

        process 2nd

        tools

                ADMT 2nd 3rd 4th 5th 6th 7th 8th 9th 10th

                Aelita Domain Migration Wizard 2nd

                BindView migration tools 2nd

                NetIQ migration tools 2nd

                ProLiant migration tools

                Quest Fastlane Migrator 2nd

        upgrade paths 2nd 3rd

migration to Exchange 2003 2nd

        Exchange design 2nd 3rd

                AD impact 2nd 3rd 4th 5th

                administrative models 2nd 3rd

                client access 2nd 3rd 4th

                Configuration NC

                directory synchronization 2nd 3rd 4th 5th 6th

                multi-forest deployment 2nd 3rd 4th 5th 6th 7th 8th 9th

                resource forests 2nd

                single forest deployment 2nd

        planning 2nd

                business justification 2nd

                SLAs 2nd

        technical assessment of the current environment

                directory infrastructure 2nd 3rd 4th 5th 6th

                exisiting messaging organization 2nd

                mail-enabled applications 2nd

                messaging systems topology 2nd

minimum requirements [See requirements]

Mission-Critical Microsoft Exchange 2000

mixed mode [See functional levels]

mixed mode (Windows 2000)

ML servers

        ML310

        ML330

        ML350

        ML370

        ML530

        ML570

ML110 server

ML310 server

ML330 server

ML350 server

ML370 server

ML530 server

ML570 server

MMC

        (Microsoft Management Console) 2nd

modeling system

        of ProLiant servers 2nd 3rd

modems

        removal of support for 2nd

MOF

        styles

MOM

        (Microsoft Operations Manager)

        monitoring Active Directory 2nd

monitoring

        Active Directory 2nd 3rd

                event logs

                MOM 2nd

                native tools 2nd

                OVOW 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th

                Quest software 2nd 3rd

                Replication Monitor 2nd

        and PMP workload 2nd

       clusters

                with HP SIM 2nd 3rd 4th

       events

                with HP SIM 2nd 3rd 4th

        IPSec

       systems

                with HP SIM 2nd 3rd 4th

Monitoring and Managing Microsoft Exchange 2003

morphed directories

        troubleshooting

morphed directory

        defined

MoveTree utility

MSA IDC [See IDC architecture]

MSCluster_Cluster class 2nd

MSCluster_Event classes 2nd

MSCluster_Network class 2nd

MSCluster_NetworkInterface class

MSCluster_Node class

MSCluster_Resource class 2nd

MSCluster_ResourceGroup class 2nd

MSCluster_ResourceType class 2nd

MSCluster_Service class

MSCS

        (Microsoft Cluster Server)

        new features 2nd

                application-monitor resources 2nd 3rd 4th

                cluster management tools 2nd 3rd 4th

                quorum schemes 2nd 3rd 4th 5th

                server consolidation best practices 2nd

                spooler resource updates 2nd

                WMI cluster management 2nd 3rd 4th 5th 6th

MSDE

        (Microsoft Database Engine)

msDS-Cached-Membership-Time-Stamp attribute (Universal Group Membership Caching)

msDS-Site-Affinity attribute (Universal Group Membership Caching)

MSMQ

        clustering 2nd

multi-forest deployment

        Exchange design

                directory synchronization 2nd

                IOPF utility

                mail connectivity

                one-off migrations 2nd

                OSTs 2nd

Multi-NIC Boot Utility package

multi- tier topology case study

        replication topology 2nd 3rd 4th 5th

multi-valued attributes

        LVR (Linked Value Replication) 2nd

multimaster model (replication)

        versus single-master model 2nd 3rd

multiple datacenter deployment

        Exchange 2003 storage groups

multiple domain model

        logical design 2nd 3rd 4th 5th 6th 7th

multiple instances of GPOs

multiple-forest structures

        versus single-forest structures

 <  Day Day Up  >    

Категории